Description: Interior choir loft and stage renovation. Demolition of integral secondary steel framing and replacment with a new extended stage and tiered choir loft. New floor framing was steel tubes posted off existing steel framing to support the new loading. Structural renovation work was designed to be done above the sanctuary floor so as not to necessitate asbestos abatement in educational spaces below.

Project Pictures
Project Information
- Title: Mallard Creek Presbyterian Church Chancel Renovation
- Location: Charlotte, NC
- Cost: $2 MM
- Completion: 2006